Home | About Us | Education Center
407.603.6165
Apr 232013
 

Construction Scheduling from a Consultant’s Perspective

At Carolina Consultants, we provide consulting, expert and advisory services in the area of critical path method (CPM) planning and scheduling. Our focus is on providing insight into your project’s most valuable tool – its schedule.

cpm_large

At Carolina Consultants we have seen the value and benefits of a well-developed and properly-maintained project schedule. A project schedule can be an invaluable tool in the management of the most important elements of a construction project.

We have also seen the down side of not properly maintaining a project schedule. Such as having to rely on other project records to prove a claim when the information would have been readily available had the schedule been properly maintained and updated.

The following are some of the major benefits of having a good project schedule:

Managing Construction Risk

The schedule is one of the most important tools for managing risk on a construction project. As things inevitably change on the project, the schedule is the best vehicle for evaluating the impact of changes on other elements of the project. It is also a powerful tool for scenario planning and mitigating the affect of a change. Additionally, the project schedule is by far the best tool for early identification of problems and trends that could jeopardize project success.

Managing and Coordinating the Construction Project

Schedules are often the primary tool used by project managers and superintendents to manage and coordinate the work of the various trade contractors on the project. A well-developed schedule will clearly model and illustrate the team’s plan for executing the project. Additionally, a well-developed and properly-updated schedule can accurately predict the completion date of the project, not only at the beginning but as the project progresses. Project schedules are often used by your subcontractors and suppliers to coordinate their own work and as a production forecasting tool.

Communicating the Construction Plan

The is no better tool for communicating the team’s plan for executing the project than the project schedule. As the plan is adjusted for changes and actual performance, the schedule should be updated and distributed to the various parties – subcontractors, suppliers, vendors, the owner, the architect/engineer, inspectors, etc. It helps keep everyone up to date and on the same page.

As-Built Schedule and Schedule Analysis

A properly-updated and maintained schedule is an invaluable depository of “as-built” information for the project. This information can be used for later review in planning projects in the future, or as an analysis tool for documenting or defending against a claim.

For all of these reasons, it makes sense to invest the time and effort into developing and properly maintaining a project schedule. Whether you need help preparing a baseline project schedule or you would simply like professional feedback on an existing schedule, Carolina Consultants can develop a cost-effective, comprehensive solution to meet your project’s needs. Contact Don W. Carlow, PSP at (407) 603-6165 or don@Carolina-Consultants.com.